bonding

This conservatory had old timber beams placed across the ceiling before it was then slabbed and skimmed. A simple enough job lasting 2 days

This attic conversion was Slabbed using 1/2″ plasterboard on ceilings and partitions and 60mm insulated board on exterior walls. The ceiling’s were bonded to give a curve feature before the whole project was skimmed. Job took around 4 days in total.

This project involved the repairing the joists of the ceiling before it was rewired and plasterboarded. The walls were then insulated with thermoboard before all rooms were skimmed. Cornice (coving) and centerpieces were added to complete the finish.

An Extension in Castleknock which was renovated and reskimmed over stipple ceilings in the old section, The new section was done in Insulated board plugged to the exterior walls before been skimmed The exterior was finisher in a Sponge finish to match the existing Building.

This is a renovation/re-skim of a house in Lemibrien Co. Waterford. The ceilings were re-slabbed and skimmed as well as some walls been bonded and reskimed. Two walls were knocked and a set in fireplace swapped for the existing open fire. Some dry-dashing was done outside to compensate for a window which was removed.

A reskim of a cottage in Co. Kildare This involved thistle bonding the ceiling and two walls. The walls were then chased to allow for cables before bonding. We removed and blocked the old fireplace leaving a hole for a vent to be put in after. The room was then skimmed before we rehung the […]

This protect consisted of sand and cement sponge finish over block on the outside and Plaster-boarding, slabbing and skimming on the inside. The outside was first scudded at a mix of sand,lime and cement 1;1 before it was scratched with a mix at 3;1. The final cot was mixed at 4;1 and finished with a […]

First the top ceilings of the house were plaster-boarded with 70 mm insulated thermal plasterboard’s before we then plaster-boarded all the partitions.It was decided to use hard-coat on all block walls instead of sand and cement to allow for superior drying. The house is airtight with membrane on all ceilings upstairs and around all windows […]

This house was completed interior and exterior. The outside was Plastered in sand and cement with a sponge finish to allow finishing with Acrylic and the internal was dry-lined, Floated and skimmed.InteriorThe interior plastering was completed over the course of four weeks,I dry-lined the upstairs and downstairs ceilings with half inch plasterboard. All block walls […]

This 20 meter square extension was to be boarded, rendered and skimmed on the inside with some patchwork to be completed on other parts of the house, The outside was scudded, scratched, dry dashed finished with bands with a sponge finish.