This conservatory had old timber beams placed across the ceiling before it was then slabbed and skimmed. A simple enough job lasting 2 days

This attic conversion was Slabbed using 1/2″ plasterboard on ceilings and partitions and 60mm insulated board on exterior walls. The ceiling’s were bonded to give a curve feature before the whole project was skimmed. Job took around 4 days in total.

This project involved the repairing the joists of the ceiling before it was rewired and plasterboarded. The walls were then insulated with thermoboard before all rooms were skimmed. Cornice (coving) and centerpieces were added to complete the finish.

An Extension in Castleknock which was renovated and reskimmed over stipple ceilings in the old section, The new section was done in Insulated board plugged to the exterior walls before been skimmed The exterior was finisher in a Sponge finish to match the existing Building.

This is a renovation/re-skim of a house in Lemibrien Co. Waterford. The ceilings were re-slabbed and skimmed as well as some walls been bonded and reskimed. Two walls were knocked and a set in fireplace swapped for the existing open fire. Some dry-dashing was done outside to compensate for a window which was removed.

This house was built in the 70,s in brick on the internal walls which was then painted. the second half or the house built in the 80,s was finished the same.  Our objective is to plaster the existing brick walls to achieve a more modern finish while adhering to airtight standard, All ceilings had also […]

This house was completed interior and exterior. The outside was Plastered in sand and cement with a sponge finish to allow finishing with Acrylic and the internal was dry-lined, Floated and skimmed.InteriorThe interior plastering was completed over the course of four weeks,I dry-lined the upstairs and downstairs ceilings with half inch plasterboard. All block walls […]

This project involved Sticking plasterboard onto existing brick walls, Sticking involves scabbing large blobs of plasterer onto the walls, then placing the plasterboard against these blobs using a strait edge and level to tap the plasterboard until the wall is strait and plumb.The walls were quiet old so had to be cleaned and treated before […]

This project included the insulation, Slabbing, taping and jointing of a house in Clare. We started this house by sealing in-between the rafters where the insulation had been left slack.Using Rockwool we insulated all the downstairs ceilings and the partitions dividing the bedroom walls using all remaining material in the attic.The plasterboard took a week […]