taping and jointing

This house was built in the 70,s in brick on the internal walls which was then painted. the second half or the house built in the 80,s was finished the same.  Our objective is to plaster the existing brick walls to achieve a more modern finish while adhering to airtight standard, All ceilings had also […]

First the top ceilings of the house were plaster-boarded with 70 mm insulated thermal plasterboard’s before we then plaster-boarded all the partitions.It was decided to use hard-coat on all block walls instead of sand and cement to allow for superior drying. The house is airtight with membrane on all ceilings upstairs and around all windows […]

This project involved Sticking plasterboard onto existing brick walls, Sticking involves scabbing large blobs of plasterer onto the walls, then placing the plasterboard against these blobs using a strait edge and level to tap the plasterboard until the wall is strait and plumb.The walls were quiet old so had to be cleaned and treated before […]

These ceilings were in Carrig Dunne in Jarvis street. The ceilings were quite high so had to be taped and jointed, this is achieved by sticking skrim tape to all straight joints, paper tape to internal angles and flex (corner) tape to externals.All joints are giving a two coats of joint filler before and the […]

This project included the insulation, Slabbing, taping and jointing of a house in Clare. We started this house by sealing in-between the rafters where the insulation had been left slack.Using Rockwool we insulated all the downstairs ceilings and the partitions dividing the bedroom walls using all remaining material in the attic.The plasterboard took a week […]