We began this project by scudding the entire house in a scud coat of around 1/1 sand and cement.

We then scratch coated the house with a mix of 3:1:1/2 sand/cement and lime adding water proofer as needed.  The bands on this project were a little awkward due to the windows on the new part of the house been fitted incorrectly, however we managed to get a 3 inch band around all the windows to give the house an original affect.Next, was the finishing of the house which was mixed at 3.5:1:1 sand/cement/lime and waterproofing to suit, applying with suitable thickness to allow a old style nap finish in situ with the property.

The project took about 8 days in total.